Electrical inspection
Fixed fee
Attendance, testing and a written condition report on an existing installation.
Inspection · Installation · Certification
Create Professional Electrician Invoices
Electrical work is billed in three parts that customers think of separately: the labour, the materials, and the testing and certification that makes the job legal.
The generator starts with electrical line items — installation labour, materials and a compliance certificate — so you can price the job and download the PDF without rebuilding the layout each time.
Loaded with electrician line items you can edit, rename or remove.
An electrician's invoice bills for installation or repair work along with the inspection and certification that accompanies it. Much of the value is invisible once the cover plate goes back on, which is why the description has to carry the detail: what was installed, what was tested and what documentation was issued.
Compliance also changes who reads the invoice. Landlords, agents and main contractors often file it next to a certificate and a report, so references, addresses and dates matter more here than on a typical service bill.
Circuits worked on, materials used, hours, and the certificate or report number issued.
A booked inspection or callout is its own line, with what it includes stated plainly.
Hours in the quantity column at your rate. Split apprentice and qualified rates if you charge them differently.
Cable by the metre, breakers, enclosures and accessories — enough for the customer to see where the money went.
Show inspection, testing and the issued certificate as a distinct charge rather than absorbing it into labour.
Note the certificate number, set your payment terms and email the PDF with the report attached.
Fixed fee
Attendance, testing and a written condition report on an existing installation.
Per hour
Time spent installing, altering or repairing circuits and equipment.
Per metre or unit
Cable runs, breakers, enclosures, sockets, switches and fixings supplied.
Per job
Upgrade or replacement quoted as a package including make-safe and re-testing.
Per certificate
Compliance testing and the issue of the certificate or report the job requires.
Fixed fee
Out-of-hours attendance for faults, usually including a set period on site.
A consumer unit upgrade with materials and compliance testing, billed to a homeowner.
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Switchboard upgrade — labour (hrs) | 6 | 95.00 | 570.00 |
| Materials — RCBOs, enclosure, cabling | 1 | 640.00 | 640.00 |
| Certificate of compliance and testing | 1 | 150.00 | 150.00 |
| Make good and waste removal | 1 | 80.00 | 80.00 |
| Subtotal | 1,440.00 | ||
| Tax (15%) | 216.00 | ||
| Total due — Net 7 | 1,656.00 | ||
Landlords and agents often cannot release payment until the compliance document is on file.
Customers accept a diagnostic charge readily when they hear it before you attend, and resent it afterwards.
On site work, an invoice without the project code goes to the bottom of the pile.
Domestic work is usually payable on receipt; 30-day terms are for accounts you agreed them with.
Absorbing certification into labour trains customers to expect compliance work for free.
A large materials figure with no breakdown is the line most likely to be challenged.
Landlords with several properties cannot allocate the cost, so the invoice waits.
Extra faults fixed during a visit need approval and their own line, or they go unpaid.
Usually yes. Inspection, testing and issuing a certificate is chargeable work with its own time and liability, and showing it as its own line explains why a small installation still carries a compliance cost.
Bill the inspection as a fixed fee covering attendance, testing and the written report. If remedial work follows, invoice it separately so the customer can see what was diagnosis and what was repair.
List materials as their own lines — cable by the metre, accessories by the unit — or as one supply line at your selling price with the main items named. Either works as long as it matches the quote.
Yes. On construction jobs you usually bill the main contractor. Include the site address and their job reference, because they reconcile subcontractor invoices against project codes.
Show the callout at your emergency rate on its own line, with the time and date in the description, then add labour beyond the included period separately.
It is a useful habit. Putting the certificate or report number in the notes links the paperwork to the payment, which helps landlords and agents who file both together.
Edit the line items, add your details and download a clean PDF. Free, no account and no watermark.